ALLIANCE AE7133 Instrukcja Obsługi Strona 75

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 74
74 60549
Section 8 Service Procedures Unique to Electronic Control Model Dryers
To reduce the risk of electric shock, fire, explosion, serious injury or death:
Disconnect electric power to the dryer(s) before servicing.
Close gas shut-off valve to gas dryer(s) before servicing.
Never start the dryer(s) with any guards/panels removed.
Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC DO NOT COPY or TRANSMIT
Through Serial No. S6271975XG
Reinstall the three cupped washers and nuts
if removed in Step 3 and tighten securely,
or use cupped washers and nuts from the
accessories pack if the cord is being
installed for the first time.
Starting Serial No. S6271976XGUsing
the three wire-binding (10-32x3/8") screws
from the accessories envelope (located
inside the cylinder, unless the screws were
previously removed in Step 2), attach the
power cord wires to the terminal block
terminals as follows:
(a) Red to Red
(b) Black to Black
(c) White to White (see NOTE below)
NOTE: When installing the white wire, loop the free
eyelet end of the green ground wire (from Step 4)
and place it together with the white wire. Attach
both wires to the neutral (center) terminal on the
terminal block. Refer to Figure 56.
IMPORTANT: Failure to tighten the screws firmly
on the terminal block may result in terminal block
failure.
(9) Tighten the two strain relief screws to
secure the power cord.
(10) Recheck all nuts or screws to be sure they
are tight.
(11) Reinstall the access plate and screw to the
rear of the dryer cabinet.
Przeglądanie stron 74
1 2 ... 70 71 72 73 74 75 76 77 78 79 80 ... 124 125

Komentarze do niniejszej Instrukcji

Brak uwag